Autumn 2014 | |
Track and path maintenance. | Newly-dug trackside ditch. |
The completed boardwalk. | |
The boardwalk under construction over a boggy area using Sallerton Wood Chestnut. | Charring the boardwalk stakes to deter decay. |
Woodland Shelter. | Lunch time in the woodland shelter. |